top of page

No. 1 River Landing

Saskatoon, SK

Year:

Size:

Owner:

Architect:

2019

7,464 sqm Parkade
15,001 sqm Condo Tower
9,474 sqm Hotel Tower

Victory Majors Investments Corporation/Triovest (West Parkade)
Victory Majors Investments Corporation/Urban Capital (Condo Tower)
Victory Majors Investments Corporation/Groupe Germain (Hotel Tower)

Gibbs Gage Architects (West Parkade)
LemayMichaud | Architecture Design and aodbt architecture + interior design (Condo Tower)
LemayMichaud | Architecture Design (Hotel Tower)

JCK Engineering provided structural engineering services for the design of No.1 River Landing Condominium at the River Landing Development in Saskatoon. The mixed-use River Landing West Development consists of a Condo and Hotel supported on four levels of underground parking.
The design of the parkade and respective foundations preceded the design of the two towers. The Condo tower was originally scheduled to be a 16 storey building but after heavy pre-sales four additional floors were added. The Condo is supported on a transfer floor located at the main level that includes 2.0m thick beams.

bottom of page