top of page

Swift Current Joint Use School

Swift Current, SK

Year:

Size:

Owner:

Architect:

2014

11,500 sqm

Chinook & Holy Trinity School Divisions

Stantec Architecture & aodbt architecture +interior design

The Swift Current Joint Use School is a new school for children ages Pre-Kindergarten to Grade 8. The building houses École Centennial School and All Saints Catholic School. This school is unique due to its level of integration between school divisions. Both schools share the use of the band room, library, practical arts centre, and multiple handicapped spaces. The facility also contains new child care space for the city of Swift Current. This building was designed to LEED Silver and opened in the fall of 2014. The schools are part of a larger Integrated Facility concept for Swift Current.

All Saints Catholic School- 2015 Premier’s Awards of Excellence in Design winner

bottom of page