top of page

AGT Foods

Regina, SK

Year:

Size:

Owner:

Architect:

This facility was built in 2002 east of Regina and houses a processing plant for the cleaning, sorting and packaging of pulse crops. The project includes office space, warehouse space and process areas.

The building consists of a combination of conventionally steel framed systems and pre-engineered systems. Large amounts of storage are provided in steel silos both inside and outside of the building. The facility includes a truck shed with a built-in scale, along with an underground shout. Steel catwalks are provided for maintaining the exterior silos.

bottom of page